Skip to main content
Cheat SheetGELE · Cadastral Surveys & Land LawsReal content

GELE Cadastral Surveys & Land LawsCadastral and Isolated SurveysCheat Sheet

One-page cheat sheet for GELE Cadastral Surveys & Land Laws — Cadastral and Isolated Surveys. Every formula, definition, and key fact you need for this chapter, condensed to a single printable page. Designed for the final review session before the GELE 2026.

Exam context

The Geodetic Engineer Licensure Examination is conducted by Professional Regulation Commission (PRC) — Board of Geodetic Engineering and is scheduled for September 2026. The Cadastral Surveys & Land Laws subtest is marked as "Core" in the official pattern, and Cadastral and Isolated Surveys appears in position 1st of 5 in the GELE Cadastral Surveys & Land Laws review rotation. Passing mark: 70% weighted average, no sub-test below 50%. Recent GELE 2026 papers have drawn roughly a meaningful share of questions from this subject.

Cadastral and Isolated Surveys - Cheat Sheet

Your exam-ready quick reference for cadastral and isolated surveys, land monumentation, control ties, and Philippine land laws. Review the must-remember items and diagrams in the final 30 minutes before the PRC Geodetic Engineer Licensure Examination.

Sections

Section Title

Survey Types & Classification

Important Facts

  • Cadastral = all parcels (systematic); isolated = one parcel (ad hoc).
  • Cadastral surveys are DENR-LMB responsibility; isolated surveys may be private but must tie to cadastral control.
  • Both types must reference PRS92 datum for absolute coordinates.
  • Cadastral data feed the Torrens system (RA 496, Property Registration Decree of 1988).
  • Parcel ID: lot number + cadastral block + cadastral case (e.g., Lot 5, Block 2, Cad-250).

Key Definitions

Term

Cadastral Survey

Example

Survey of all 500+ lots in a barangay for the cadastral map and Torrens registration.

Definition

Systematic survey of ALL parcels within a municipality or city to fix and record boundaries for land registration, conducted by DENR-LMB.

Term

Isolated (Individual) Survey

Example

Resurveying one titled lot to verify boundary for a fence installation.

Definition

Survey of a SINGLE lot for titling, transfer, relocation, or development; tied to existing cadastral/geodetic control.

Term

Relocation Survey

Example

Finding and monumenting corners of a lot whose original markers have been destroyed.

Definition

Isolated survey to re-establish boundary marks of a parcel using original technical description and cadastral references.

Term

Public-Land Survey

Example

Surveying a timber concession area or homestead application.

Definition

Survey of alienable public lands for homestead, timber, or mineral purposes; approved by DENR.

Diagrams To Know

  • Cadastral block layout (showing lot numbers and block arrangement).
  • Isolated survey sketch (single lot with tie line to nearest control monument).
  • Hierarchical relationship: municipality → cadastral case → cadastral block → lot.

Common Values

Value

0.20 m × 0.20 m × 0.60 m (h)

Symbol

Std. BL marker

Quantity

Standard concrete monument dimensions

Value

40–50 m

Symbol

Urban intervals

Quantity

Typical monument spacing (urban)

Value

100+ m

Symbol

Rural intervals

Quantity

Typical monument spacing (rural)

Value

6,378,137 m

Symbol

a (WGS84)

Quantity

PRS92 ellipsoid semi-major axis

Value

1/298.257223563

Symbol

f (WGS84)

Quantity

PRS92 ellipsoid flattening

Section Title

Monumentation & Control Ties

Important Facts

  • Every parcel corner must be tied to a BLLM or geodetic control point — no isolated geometry.
  • Tie = distance (m) and bearing (degrees, minutes, seconds) from corner to control monument.
  • Monumentation materials: concrete, stone, or iron (stainless steel caps recommended in saltwater zones).
  • Monument intervals typically 40–50 m in urban areas, wider in rural zones.
  • BLLMs are usually at municipal halls, schools, or public buildings for accessibility.
  • Bearing is measured from north of the meridian (true, magnetic, or grid); use PRS92 grid north in PPCS.
  • Coordinate system: PRS92 (WGS84 ellipsoid) with PPCS (UTM variant) projection.
  • Tie survey must precede parcel corner survey to establish absolute position.

Key Definitions

Term

Monument (Marker)

Example

Reinforced concrete pillar (0.20 m × 0.20 m × 0.60 m) with brass cap and parcel/block number.

Definition

Permanent, durable boundary mark installed at parcel corners; concrete, stone, or official BL/BLLM markers.

Term

BLLM (Bureau of Lands Location Monument)

Example

Concrete monument at a municipal center or known landmark, coordinates surveyed to PRS92.

Definition

Official geodetic control monument established and maintained by DENR-LMB; provides absolute reference for parcel ties.

Term

Tie Line (Control Tie)

Example

Corner A of Lot 5 is 127.45 m on bearing 045°15'30" from BLLM-250-A.

Definition

Distance and bearing from a parcel corner to the nearest BLLM or geodetic control point; gives parcel absolute coordinates.

Term

Geodetic Control

Example

Third-order or fourth-order control points established by NAMRIA or DENR-LMB.

Definition

Network of survey-grade monuments with precisely determined coordinates on PRS92; provides datum for all cadastral surveys.

Diagrams To Know

  • Monument cross-section (showing depth, cap, and reference mark).
  • Tie-line diagram (parcel corner to BLLM with distance and bearing).
  • Coordinate system diagram (true north, grid north, magnetic north).

Common Values

Value

1:500 to 1:1000

Symbol

Urban scale

Quantity

Cadastral map scale (urban)

Value

1:1000 to 1:2000

Symbol

Rural scale

Quantity

Cadastral map scale (rural)

Value

0.01 m (1 cm)

Symbol

Cadastral precision

Quantity

Minimum distance precision

Value

DMS (±1 sec) or dec. deg. (±0.0001°)

Symbol

Bearing precision

Quantity

Bearing notation precision

Section Title

Cadastral Survey Process & Documentation

Important Facts

  • Cadastral map scale: typically 1:500 (urban) to 1:2000 (rural) depending on lot density.
  • Bearing origin: grid north (PPCS/UTM) referenced to PRS92 datum.
  • Distance units: meters (m), to 0.01 m precision minimum.
  • Bearing precision: degrees, minutes, seconds (DMS) or decimal degrees.
  • Monument positions plotted on cadastral map to ±0.1 m accuracy.
  • Lot data (area, corner coords, technical description) recorded in cadastral register.
  • Cadastral map filed at DENR-LMB and municipal assessor's office.
  • Approved cadastral map is basis for Torrens land registration.
  • Field survey must be tied to at least two independent BLLMs for validation.

Key Definitions

Term

Cadastral Map

Example

1:500 to 1:1000 scale map with 200+ lots, block lines, and azimuths marked.

Definition

Large-scale map showing all parcels in a municipality with lot numbers, block numbers, boundaries, and monument locations.

Term

Technical Description

Example

"From corner A, N 45°30'00" E, 125.50 m to corner B; thence S 44°20'15" E, 98.75 m to corner C..." etc.

Definition

Textual description of a parcel's boundaries by bearings and distances, starting from a known point.

Term

Lot Number

Example

Lot 27 in Block 5 of Cad-Case 250-Brgy. Pag-asa.

Definition

Unique identifier for a parcel within a cadastral block; assigned sequentially by DENR-LMB.

Term

Cadastral Block

Example

Block 3 contains Lots 1–15, all fronting on Magsaysay Avenue and San Pablo Street.

Definition

Group of parcels bounded by streets or roads; all lots within a block share a block number.

Term

Cadastral Case

Example

Cad-Case 250 = entire cadastral survey of Nueva Ecija municipality.

Definition

Complete cadastral survey project for a municipality or city; all blocks and lots fall within one case number.

Diagrams To Know

  • Sample cadastral map section (4–6 blocks with lot numbers and street names).
  • Bearing and distance annotation on a parcel (e.g., N 45°30'00" E, 125.50 m).
  • Monument reference mark (showing elevation, cap type, and coordinates).

Section Title

Philippine Agencies & Legal Framework

Important Facts

  • RA 4374 (Cadastral Act of 1965): primary law authorizing cadastral surveys in the Philippines.
  • RA 8560 (Agriculture and Fisheries Modernization Act): amends RA 4374, accelerates cadastral survey.
  • PD 1529 (Property Registration Decree of 1988): Torrens system for land registration; cadastral data feed into PD 1529.
  • CA 141 (Public Land Act): governs public-land disposal and classification; cadastral surveys identify public vs. private land.
  • Geodetic Engineer must be licensed (PRC) and must supervise all cadastral/isolated surveys in the Philippines.
  • DENR-LMB approval required before any cadastral survey fieldwork begins.
  • Cadastral survey results filed at LMB regional office and municipal assessor.
  • Torrens title (from cadastral data) is indefeasible after one-year period (PD 1529).
  • Geodetic datum: PRS92 (Philippine Reference System 1992) = WGS84 with local adjustments.
  • Projection: PPCS (Philippine Position Classification System) = UTM variant with false easting/northing.

Key Definitions

Term

DENR (Department of Environment and Natural Resources)

Example

Issues land titles, approves cadastral surveys, maintains land records.

Definition

Philippine government agency responsible for land management, cadastral surveys, and public-land administration.

Term

LMB (Land Management Bureau)

Example

Calauan LMB Office approves all cadastral surveys in Laguna.

Definition

Sub-agency of DENR overseeing cadastral surveys, land titling, and boundary disputes; regional offices in each province.

Term

BLGS (Bureau of Lands Geodetic Survey)

Example

Historical reference in older documents; modern equivalent is DENR-LMB.

Definition

Superseded unit; cadastral survey authority now housed within LMB.

Term

NAMRIA (National Mapping and Resource Information Authority)

Example

Establishes and maintains third-order control points; publishes official datum parameters.

Definition

Government agency maintaining geodetic control network and producing topographic/orthophoto maps on PRS92.

Diagrams To Know

  • Organizational flow chart (DENR → LMB → Regional Office → Municipal Assessor).
  • Land registration workflow (cadastral survey → LMB approval → Torrens registration → title issuance).
  • Geodetic datum hierarchy (WGS84 ellipsoid → PRS92 local datum → PPCS projection).

Formulas

Formula

Parcel Area = (1/2) × |Σ(x_i × y_{i+1} − x_{i+1} × y_i)|

Meaning

Shoelace formula for polygon area from Cartesian coordinates; x_i, y_i are corner coordinates in order.

Watch Out

Coordinates must be in order (clockwise or counterclockwise); missing or mis-ordered corners give wrong area or negative result.

When To Use

Computing area of a surveyed parcel from corner coordinates; closes the polygon.

Formula

Bearing_Grid = Bearing_Magnetic + Magnetic_Declination

Meaning

Bearing_Grid = grid bearing; Bearing_Magnetic = compass bearing; Magnetic_Declination = angular difference (east or west).

Watch Out

Declination changes with location and year; use current declination from NAMRIA; add east decl., subtract west decl.

When To Use

Converting compass (magnetic) bearings to grid bearings for PRS92/PPCS surveys.

Formula

Distance_Grid = Distance_Ground × (cos(elevation_angle)) / Scale_Factor

Meaning

Distance_Grid = horizontal distance on grid; Distance_Ground = measured slope distance; cos(elevation_angle) = horizontal component; Scale_Factor = PPCS UTM factor (~0.99962).

Watch Out

Slope distance reduction is critical; neglecting elevation correction introduces 0.1–1 % errors in parcel boundaries.

When To Use

Reducing measured slope distance to grid distance for cadastral records.

Section Title

Isolated Survey Details & Procedures

Important Facts

  • Isolated survey must start with control tie before any lot boundary measurement.
  • Corner coordinates are computed from tie coordinates + offset vectors (bearing and distance).
  • At least two independent corners must be tied to two BLLMs (cross-tie) for validation.
  • Monument type and position must match cadastral map symbols and description.
  • Isolated survey sketch must show: parcel outline, corner numbers, bearings, distances, tie line(s), and adjacent lot reference.
  • Technical description in isolated survey follows cadastral standard: start point, bearing-distance chain around parcel.
  • Parcel area computed from corner coordinates (Shoelace formula); compared with cadastral record for closure check.
  • Field notes must record: monument condition, tie measurements, corner coordinates, sketch.
  • Survey permit (or exemption) from LMB required; licensed geodetic engineer must sign.
  • Isolated survey data are filed at LMB and municipal assessor for land registration.

Key Definitions

Term

Relocation Survey

Example

Owner of Lot 8, Block 3, Cad-250 commissions resurvey to replace destroyed corner monuments.

Definition

Isolated survey to re-establish lot boundary using original technical description and cadastral control.

Term

Verification Survey

Example

Buyer hires surveyor to verify boundary before purchase; no new monuments installed.

Definition

Isolated survey to confirm existing lot boundaries without monumentation changes; used for title transfer or dispute prevention.

Term

Subdivision Survey

Example

Lot 12 (5,000 m²) subdivided into Lot 12-A (3,000 m²) and Lot 12-B (2,000 m²).

Definition

Isolated survey dividing one lot into two or more sub-parcels; each sub-parcel gets new lot number and technical description.

Term

Control Tie (Cadastral Tie)

Example

Corner A of Lot 5 is 142.30 m on bearing 062°45'15" from BLLM-250-D.

Definition

Measurement from parcel corner to nearest BLLM or third-order control point; provides absolute position.

Diagrams To Know

  • Isolated survey sketch (single lot with control tie, corner numbers, bearings, distances).
  • Subdivision diagram (original lot and sub-lot boundaries with new lot numbers).
  • Corner coordinate computation from tie (starting BLLM coords + tie offset + parcel offsets).

Formulas

Formula

UTM_Easting = 500,000 + ρ × sin(θ)

Meaning

UTM_Easting = easting coordinate (m); ρ = distance from central meridian (m); θ = bearing from north; 500,000 = false easting.

Watch Out

False easting (500 km) prevents negative coordinates; do NOT forget it; PPCS uses identical structure.

When To Use

Converting polar (bearing, distance) to Cartesian (E, N) in PPCS/UTM.

Formula

UTM_Northing = ρ × cos(θ) + k0 × M

Meaning

UTM_Northing = northing coord. (m); k0 = scale factor (~0.99962); M = arc distance from equator (m).

Watch Out

Scale factor k0 compresses distances near meridian; ignore at your peril for long-distance cadastral ties.

When To Use

Computing UTM northing (grid north distance) for PRS92 geodetic position.

Common Values

Value

120°E

Symbol

CMZ1

Quantity

PPCS central meridian (Luzon Zone 1)

Value

121°30'E

Symbol

CMZ2

Quantity

PPCS central meridian (Luzon Zone 2)

Value

123°E

Symbol

CMZ3

Quantity

PPCS central meridian (Luzon Zone 3)

Value

0.99962

Symbol

k0 (UTM)

Quantity

PPCS scale factor (k0)

Value

500,000 m

Symbol

E0

Quantity

False Easting (PPCS/UTM)

Value

0 m (or 10,000,000 m in southern hemisphere)

Symbol

N0

Quantity

False Northing (PPCS/UTM)

Section Title

Coordinate Systems & Datums for Cadastral Surveys

Important Facts

  • PRS92 uses WGS84 ellipsoid: a = 6,378,137 m, f = 1/298.257223563.
  • PPCS divides Philippines into 4 zones (Luzon Zones 1–3, Mindanao Zones 1–2); each has central meridian.
  • UTM scale factor k0 = 0.99962 near central meridian; distance contracts by 0.038 % at zone edge.
  • For cadastral ties < 500 m, scale factor correction is negligible (< 2 mm); for longer ties, must apply.
  • Bearing origin = grid north (PPCS); use compass bearings with declination correction.
  • Conversions: GPS (WGS84) → PRS92 (negligible for Philippines) → PPCS grid coordinates.
  • Cadastral map printed in PPCS grid; grid lines shown at 1 km or 500 m intervals.
  • Zone boundary: surveys crossing zones must have coordinates in both zones or use transverse tie.
  • NAMRIA publishes PRS92 ellipsoid parameters, PPCS formulae, and annual magnetic declination for each province.

Key Definitions

Term

PRS92 (Philippine Reference System 1992)

Example

All DENR cadastral surveys use PRS92 coordinates; equivalent to WGS84 for practical purposes.

Definition

Geodetic datum for the Philippines; based on WGS84 ellipsoid with local adjustments; official reference for all surveys.

Term

WGS84 (World Geodetic System 1984)

Example

GPS receivers output WGS84 by default; converted to PRS92 for Philippine official use.

Definition

Global ellipsoid and geodetic datum; PRS92 is a localized realization of WGS84 for the Philippines.

Term

PPCS (Philippine Position Classification System)

Example

Luzon Zone 3 covers east of 122°E; coordinates are 6-digit eastings and 7-digit northings in meters.

Definition

Conformal map projection (UTM variant) using PRS92 datum; divided into zones for the Philippines.

Term

False Easting / False Northing

Example

A point 10 km west of central meridian has easting 490,000 m (not −10,000 m).

Definition

Artificial offset added to zone origin to ensure all coordinates are positive; 500,000 m easting, 0 m northing (UTM standard).

Term

Grid North vs. Magnetic North vs. True North

Example

In Metro Manila, grid north ≈ true north (small convergence); magnetic declination ≈ +4° east of true north.

Definition

Grid north = PPCS projection north; True north = geographic pole; Magnetic north = compass heading.

Diagrams To Know

  • PPCS zone map (showing 4 zones for Philippines with central meridians).
  • UTM grid overlay on cadastral map (showing grid north lines and false easting/northing origin).
  • Bearing diagram (true north, grid north, magnetic north with convergence angle).

Section Title

Common Pitfalls & Exam Traps

Important Facts

  • TRAP: Confusing cadastral (all parcels, systematic) with isolated (one parcel) — they are opposite in scope.
  • TRAP: Forgetting tie line — every parcel corner MUST be tied to BLLM; isolated geometry alone is invalid.
  • TRAP: Using magnetic bearing without declination correction — causes ~2–4° error in boundaries.
  • TRAP: Ignoring scale factor — 0.05 m error over 500 m tie if k0 omitted.
  • TRAP: Mixing WGS84 with PRS92 — PRS92 is mandatory in Philippines; WGS84 is global reference.
  • TRAP: Monument spacing confusion — urban 40–50 m, rural 100+ m; exam may ask which is correct for area type.
  • TRAP: Parcel identification — lot number alone is insufficient; must include block number and cadastral case.
  • TRAP: Confusing BLLM with BLGS — BLLM = monument; BLGS = old unit (now LMB).
  • TRAP: Agency responsibility — cadastral approval is DENR-LMB, not DPWH or BIR.
  • TRAP: Bearing notation — always use DMS (D°M'S") or decimal degrees; never mix or omit units.

Must Remember

  • 1. CADASTRAL = all parcels (systematic survey by DENR-LMB); ISOLATED = one parcel (private surveyor, tied to cadastral control).
  • 2. Every parcel corner MUST be tied to a BLLM or geodetic control point with bearing and distance; isolated geometry is invalid.
  • 3. Parcel identification: Lot # + Block # + Cadastral Case (e.g., Lot 5, Block 2, Cad-250); this triplet is unique.
  • 4. DENR-LMB (not DPWH, not BIR) approves all cadastral and isolated surveys; regional offices issue permits.
  • 5. PRS92 datum (based on WGS84) and PPCS/UTM projection are mandatory for all Philippine cadastral surveys.
  • 6. Monument types: BL marker (parcel corners), BLLM (control tie point); concrete, brass cap, at least 0.20 × 0.20 × 0.60 m.
  • 7. Monument spacing: urban 40–50 m, rural 100+ m; smaller intervals = better control density.
  • 8. Bearing origin = grid north (PPCS); convert compass (magnetic) bearings using current declination (~±4° in Philippines).
  • 9. Scale factor k0 = 0.99962 (PPCS/UTM); apply to distances > 500 m for accuracy; neglect causes ~0.05 m error per km.
  • 10. Cadastral map output: large-scale (1:500–1:2000), lot numbers, block lines, monument positions, filed at LMB + municipal assessor; basis for Torrens titles.

Last Minute Tips

  • TIP 1 — On exam, if asked 'What is a cadastral survey?', answer IMMEDIATELY: 'Systematic survey of ALL parcels in a municipality, conducted by DENR-LMB, tied to BLLM control, output is cadastral map + Torrens registration.' This is THE definition; any other answer is wrong.
  • TIP 2 — If asked about a tie line, ALWAYS include THREE components: (1) starting control monument (BLLM name/number), (2) distance in meters (to 0.01 m), (3) bearing in DMS or decimal degrees. Example: 'BLLM-250-A, 142.30 m, bearing 062°45'15".' Missing any one = no points.
  • TIP 3 — When comparing cadastral vs. isolated surveys, use this mental checklist: Cadastral = DENR does it, all lots, big map; Isolated = surveyor does it, one lot, sketch. Reverse any of these? WRONG.
  • TIP 4 — Monument question? Concrete + brass cap + 0.20 × 0.20 × 0.60 m = standard BL marker. BLLM is larger, more official, has coordinates engraved. Do NOT say 'BLLM is just a BL marker'—exam will mark wrong.
  • TIP 5 — For any bearing/distance problem, ALWAYS convert to grid bearing (apply declination if starting with magnetic) and reduce slope distance (apply k0 scale factor if > 500 m). Show your steps; partial credit often awarded for method even if final answer slightly off.

Comparison Tables

Rows

Values

  • ALL parcels in municipality/city
  • ONE parcel only

Property

Scope

Values

  • Systematic land registration & taxation
  • Titling, transfer, relocation, or subdivision

Property

Purpose

Values

  • DENR-LMB (government)
  • Private surveyor (licensed geodetic engineer)

Property

Conducting Agency

Values

  • DENR-LMB regional office & municipal assessor
  • DENR-LMB (may be exempt for relocation)

Property

Approval

Values

  • Cadastral map (large-scale) + lot data register
  • Survey sketch, technical description, coordinates

Property

Output

Values

  • All blocks/lots tied to BLLM network
  • Single lot tied to 1–2 nearest BLLMs

Property

Tie Requirement

Values

  • Months to years (large municipality)
  • Days to weeks (single lot)

Property

Duration

Values

  • High (government/donor-funded)
  • Moderate (private contract)

Property

Cost

Values

  • PRS92 + PPCS/UTM
  • PRS92 + PPCS/UTM (aligned with cadastral)

Property

Datum/Projection

Values

  • 50–500+ per cadastral case
  • 1 (single lot)

Property

Typical Lot Numbers

Columns

  • Aspect
  • Cadastral Survey
  • Isolated Survey

Table Title

Cadastral Survey vs. Isolated Survey

Rows

Values

  • Reinforced concrete
  • 0.20 m × 0.20 m × 0.60 m (h)
  • Brass or stainless steel cap with center mark
  • Parcel corners, cadastral survey

Property

BL (Bureau of Lands) Marker

Values

  • Reinforced concrete (buried stone allowed)
  • Larger, 0.30 m × 0.30 m × 1.0 m (h) or more
  • Brass cap with reference mark & coordinates
  • Geodetic control tie point, long-term reference

Property

BLLM (Bureau of Lands Location Monument)

Values

  • Iron or steel pipe (1–2 inch dia.)
  • 0.60–1.0 m length, driven 0.30–0.50 m deep
  • Paint mark or nail/punch on top
  • Temporary boundary, construction/relocation survey

Property

Iron Pipe/Stake

Values

  • Natural stone (rocks stacked)
  • Height 0.30–0.60 m
  • Painted cross or chiseled X
  • Rural/remote areas where concrete impractical

Property

Stone Cairn

Values

  • Reinforced concrete, often buried
  • Large, 0.50+ m cube or more
  • Brass cap or underground mark
  • NAMRIA control points for geodetic network

Property

Third-Order Control Pillar

Columns

  • Monument Type
  • Material
  • Dimensions (typical)
  • Cap/Mark
  • Use Case

Table Title

Monument Types & Standards

Rows

Values

  • 1965
  • Authorizes systematic cadastral surveys in Philippines
  • PRIMARY law enabling all cadastral projects; DENR-LMB mandate

Property

RA 4374 (Cadastral Act)

Values

  • 1978
  • Torrens system for land registration (indefeasible titles)
  • Cadastral data feed into Torrens registration; 1-year confirmation period

Property

PD 1529 (Property Registration Decree)

Values

  • 1936 (codified)
  • Governs public-land classification, alienation, and homesteading
  • Cadastral survey identifies public vs. private; homestead applications require survey

Property

CA 141 (Public Land Act)

Values

  • 1998
  • Accelerates cadastral survey for agricultural lands
  • Expanded DENR-LMB authority; faster survey and titling for farm parcels

Property

RA 8560 (AFMA Amendment to RA 4374)

Values

  • Various
  • All land in Philippines is state property unless titled
  • Underlies cadastral system: survey confirms ownership via Torrens title

Property

RA 10027 (Regalian Doctrine, historical)

Columns

  • Law / Decree
  • Year
  • Key Authority / Purpose
  • Relevance to Cadastral Surveys

Table Title

Philippine Legal Framework for Land Surveys

Loading diagram…
Loading diagram…
Loading diagram…
Loading diagram…

Ready to practise for the GELE 2026?

Super Tutor's AI review plan adapts to your weak areas and builds a weekly practice schedule around your target GELE exam date.