Revision NotesGELE · Cadastral Surveys & Land Laws

GELE Cadastral Surveys & Land Laws — Geodetic Engineering Law and Code of EthicsRevision Notes

GELE revision notes for Geodetic Engineering Law and Code of Ethics — the essentials of the chapter on one page, from the Cadastral Surveys & Land Laws part of Super Tutor's review.

Geodetic Engineering Law and Code of Ethics - Revision Notes

This chapter covers the legal and ethical framework governing geodetic engineering practice in the Philippines. For the PRC Geodetic Engineer Licensure Examination, expect 5–10% of questions from this domain — covering RA 4374, RA 8560, the scope of practice, and the professional code of ethics. These are non-computational but high-yield board topics. Master the statutes, the regulating board's powers, the reserved acts of a licensed GE, and the hierarchy of ethical obligations to score full marks on this section.

The Geodetic Engineering Profession Law: RA 4374 and RA 8560

Exam tips

  • Memorize the sequence: RA 4374 (1965) → RA 8560 (1998) → PRC/PRBGE administers exam.
  • Remember the PRBGE has 1 Chairperson + 2 Members = 3 total; appointed by the President.
  • Know that RA 8981 (PRC Modernization Act) is the overarching PRC governance law.
  • For CPD questions, cite RA 10912 (2016) as the specific CPD statute.
  • Distinguish between: profession law (RA 8560) | land registration (PD 1529) | public land disposition (CA 141).

Key points

  • RA 4374 (approved 19 June 1965) was the original Geodetic Engineering Law of the Philippines.
  • RA 8560 — 'The Philippine Geodetic Engineering Act of 1998' — repealed and replaced RA 4374, modernizing the profession's regulatory framework.
  • RA 8560 created the Professional Regulatory Board of Geodetic Engineering (PRBGE) under the Professional Regulation Commission (PRC).
  • The PRBGE is composed of a Chairperson and two (2) Members appointed by the President of the Philippines upon recommendation of the PRC.
  • Members of the PRBGE must be registered geodetic engineers with at least ten (10) years of professional practice.
  • The Board administers the GE licensure examination, registers successful examinees, and has disciplinary powers over registered GEs.
  • The PRC Modernization Act (RA 8981, 2000) further governs the operations of the PRC and all professional regulatory boards including the PRBGE.
  • Continuing Professional Development (CPD) is mandatory for renewal of the Professional Identification Card (PIC) under the CPD Act (RA 10912, 2016).
  • The GE board examination covers: Mathematics, Survey Computations, Surveying (General), Geodesy and Photogrammetry, and Laws/Ethics/Contracts.
  • RA 8560 distinguishes the profession law from land-administration laws such as PD 1529 (Property Registration Decree) and CA 141 (Public Land Act).

Definitions

RA 4374

The original 'Geodetic Engineering Law' of the Philippines enacted in 1965, which first regulated the practice of geodetic engineering and created a Board of Examiners for Geodetic Engineers.

Importance

Historical basis; superseded by RA 8560 but frequently cited in board exam questions as the predecessor law.

RA 8560

The 'Philippine Geodetic Engineering Act of 1998,' the current governing law for the practice of geodetic engineering; creates the PRBGE under the PRC.

Importance

Primary statute tested in the board exam; governs licensure, scope of practice, and disciplinary authority.

Professional Regulatory Board of Geodetic Engineering (PRBGE)

The regulatory body created under RA 8560 and supervised by the PRC, composed of a Chairperson and two Members, responsible for administering the GE licensure examination and regulating professional practice.

Importance

Board exams ask about its composition, powers, and supervisory relationship with the PRC.

PRC (Professional Regulation Commission)

The government agency (under the Office of the President) that supervises all Professional Regulatory Boards, issues certificates of registration and Professional Identification Cards (PIC), and enforces professional standards.

Importance

The PRC — not the PRBGE alone — issues the Certificate of Registration; distinction is frequently tested.

RA 10912

The 'Continuing Professional Development (CPD) Act of 2016,' which mandates CPD compliance as a requirement for PIC renewal for all regulated professions including geodetic engineering.

Importance

CPD requirements appear in ethics and professional practice questions.

Common mistakes

  • Confusing RA 4374 (original 1965 law) with RA 8560 (current 1998 law) — RA 8560 repealed RA 4374.
  • Thinking the PRBGE alone issues the Certificate of Registration — it is the PRC that issues it, upon recommendation of the PRBGE.
  • Mixing up RA 8560 (profession law) with PD 1529 (Property Registration Decree) or CA 141 (Public Land Act) — these are land laws, not profession laws.
  • Stating that PRBGE members are appointed by the PRC — they are appointed by the President of the Philippines, upon PRC recommendation.
  • Forgetting that CPD compliance (RA 10912) is now required for PIC renewal.

Scope of Practice of a Licensed Geodetic Engineer

Exam tips

  • Use the mnemonic C-T-H-G-P (Cadastral, Topographic, Hydrographic, Geodetic, Photogrammetric) to recall all five survey types in the GE scope.
  • Any question asking 'who may sign/certify/approve a survey plan' — the answer is always the licensed GE.
  • Remember PRS92 = current official datum for all Philippine surveys; WGS84 = global GPS datum (compatible but distinct).
  • PPCS/PTM/UTM is the projection system; PRS92 is the datum — do not confuse these two concepts.
  • For land registration questions, link GE scope → PD 1529 (registration) and CA 141 (public land) as the substantive land laws.

Key points

  • RA 8560 defines the scope of practice as the preparation, execution, and reporting of surveys of all types.
  • The five core survey disciplines within the GE scope are: (1) Cadastral/Land Surveys, (2) Topographic Surveys, (3) Hydrographic Surveys, (4) Geodetic Surveys, and (5) Photogrammetric Surveys.
  • Reserved acts — acts that ONLY a licensed GE may perform: signing and sealing survey plans and documents, certifying cadastral surveys for land registration, and supervising survey parties for any survey falling under the GE scope.
  • A licensed GE must affix their official PRC seal/stamp on all survey plans and documents submitted for government approval.
  • Survey plans submitted to the Land Registration Authority (LRA) or DENR-Land Management Bureau (LMB) must be signed and sealed by a licensed GE.
  • Unlicensed persons (survey aides, survey technicians, engineering students) may assist in fieldwork but may NOT sign, certify, or take professional responsibility for a survey.
  • All surveys must conform to DENR/LMB technical standards and reference the Philippine Reference System of 1992 (PRS92) as the official horizontal datum.
  • PRS92 is referenced to the Philippine Geodetic Network (PGN) and is compatible with WGS84 (the global datum used in GPS/GNSS systems).
  • For plan projections, the Philippine Plane Coordinate System (PPCS) / Philippine Transverse Mercator (PTM) / UTM zoning applies, as prescribed by DENR Administrative Orders.
  • The preparation of subdivision plans, consolidation plans, and relocation surveys for land registration under PD 1529 all require a licensed GE.

Definitions

Cadastral Survey

A survey for the purpose of defining, delimiting, and mapping land parcels and their boundaries for the establishment of legal ownership and land registration. In the Philippines, governed by CA 141 (Cadastral Act provisions) and PD 1529.

Importance

The most frequently tested survey type in board ethics and law questions; directly tied to land-titling under PD 1529.

Topographic Survey

A survey that determines the configuration (relief) of the earth's surface, including the positions and elevations of natural and man-made features, for mapping and engineering design purposes.

Importance

Included in the GE scope; commonly the subject of exam questions on 'which survey type requires a licensed GE.'

Hydrographic Survey

A survey of bodies of water — coastal, riverine, lacustrine — measuring depth, bottom configuration, currents, and shoreline, primarily for navigation, port planning, and resource assessment.

Importance

Often overlooked by reviewees; board exams test whether hydrographic surveys fall within the GE scope — they do.

Photogrammetric Survey

A survey that uses aerial or ground-based photography (or LiDAR imagery) to determine the positions and shapes of objects and terrain, producing maps and 3D models.

Importance

Modern and growing in practice; included in the GE scope and testable in scope-of-practice questions.

PRS92 (Philippine Reference System of 1992)

The official geodetic horizontal datum of the Philippines, defined by a network of first-order triangulation and GPS-derived control points. It is the reference for all official surveys and plans submitted to DENR/LRA.

Importance

The official datum; surveys on the old Luzon Datum of 1911 must be transformed to PRS92 for current legal purposes.

Reserved Act

An act that, by law (RA 8560), may only be performed by a licensed geodetic engineer — e.g., signing/sealing survey plans, certifying cadastral surveys, supervising geodetic survey operations.

Importance

Direct board-exam target: 'Who may sign a subdivision plan?' — only a licensed GE.

Common mistakes

  • Believing that a licensed civil engineer or a survey technician may certify survey plans — only a licensed GE may do so.
  • Forgetting that hydrographic and photogrammetric surveys are within the GE scope; these are less obvious than cadastral surveys.
  • Confusing the datum: PRS92 is the current official datum; the old Luzon Datum 1911 is deprecated for new submissions.
  • Thinking WGS84 and PRS92 are identical — they are compatible but not the same; PRS92 is the Philippine national datum.
  • Ignoring that survey plans must carry the GE's official PRC seal to be legally valid.

Code of Ethics for Geodetic Engineers

Exam tips

  • In scenario-based ethics questions, always ask: 'Does this protect or harm the public interest?' — that determines the correct ethical course of action.
  • The ethics hierarchy: Public Interest > Professional Duty > Client/Employer Instructions.
  • Remember: Falsification of survey data = violation of code of ethics + potential criminal liability.
  • CPD is both a legal requirement (RA 10912) and an ethical duty (competence).
  • For questions involving monument destruction, the answer always involves refusal, reporting, and potential legal consequences.

Key points

  • The GE Code of Ethics establishes the moral and professional standards that a licensed geodetic engineer must uphold in practice.
  • The FIRST and highest obligation is to the PUBLIC INTEREST — accurate land records protect property rights, prevent disputes, and serve national development.
  • Public interest ranks above the interests of the employer or the client in all professional decisions.
  • Competence: A GE must practice only within their area of qualification and must keep skills current through CPD (RA 10912).
  • Honesty and Impartiality: No falsification of survey data, coordinates, bearings, distances, or area computations. All reported measurements must be genuine.
  • Integrity of Monuments: A GE must never disturb, remove, destroy, or falsify cadastral corner monuments, benchmarks, or geodetic control marks. Deliberately falsifying monument positions is both an ethical violation and a criminal act.
  • Confidentiality: Survey data, client information, and proprietary project details must not be disclosed without client consent, except when required by law or when public safety is at risk.
  • Conflict of Interest: A GE must disclose any personal, financial, or business interest that might compromise impartiality. Serving conflicting parties without disclosure is prohibited.
  • Fair Dealing: GEs must deal honestly with clients, fellow professionals, subordinates, and government agencies.
  • Refusal of Unethical Instructions: A GE must refuse instructions to produce false or misleading survey outputs, even if the client or employer demands it.
  • A GE who discovers that a boundary has been fraudulently placed has a duty to report it to the appropriate authority (DENR-LMB, LRA, or courts).
  • The code also covers professional advertising, fee-setting, and competitive bidding — GEs should not underbid solely to win contracts at the expense of quality.

Definitions

Public Interest (Ethics)

The welfare and rights of the general public, particularly those whose property rights depend on accurate survey data. Under the GE code of ethics, the protection of public interest is the GE's primary obligation.

Importance

Most important ethical principle; tested in scenario-based board questions (e.g., 'What should the GE do when a client demands falsification?').

Competence

The professional obligation to undertake only those surveys and tasks for which the GE has adequate knowledge, skill, training, and resources; and to maintain these through CPD.

Importance

Tied to CPD requirements; accepting projects beyond one's competence without proper supervision violates the code.

Integrity of Monuments

The ethical (and legal) duty to preserve, protect, and accurately record the positions of all survey monuments — cadastral corner marks, benchmarks, triangulation stations, and geodetic control points.

Importance

Destroying or falsifying monuments has direct legal consequences (criminal liability) and is a serious ethical violation.

Conflict of Interest

A situation in which a GE's personal, financial, or professional interests could improperly influence their professional judgment or actions on behalf of a client or employer.

Importance

GEs are required to disclose conflicts of interest; failure to do so is an ethical violation and grounds for disciplinary action.

Confidentiality

The duty to keep client survey data, project information, and proprietary details private and not to use or disclose such information without proper authorization.

Importance

Balanced against the public-interest duty — when public safety or legal compliance is at stake, disclosure may be required.

Common mistakes

  • Placing client interest above public interest — the code is clear that PUBLIC INTEREST is the highest obligation.
  • Thinking a GE may falsify data if the client 'pays' or 'instructs' them to — refusal is mandatory regardless of commercial pressure.
  • Confusing competence with licensing — a GE may be licensed but still lack competence in a highly specialized area (e.g., offshore hydrographic surveys).
  • Believing confidentiality is absolute — it yields to public safety and lawful authority.
  • Failing to recognize that monument tampering is both an ethical violation AND a criminal act under Philippine law.

Relationship Between Profession Law and Land Laws

Exam tips

  • Use this chain: GE prepares plan → LMB approves plan → Court/LRA issues decree → Register of Deeds issues OCT.
  • For public land patents: DENR (via PENRO/CENRO under CA 141) → LRA registers the patent → Register of Deeds issues OCT.
  • Remember: RA 8560 = profession; PD 1529 = Torrens registration; CA 141 = public land disposition.
  • The LMB (DENR) is the technical approver; the LRA (DOJ) is the administrative registrar — different agencies, different roles.
  • Board questions often ask: 'Under which law is a homestead patent processed?' Answer: CA 141.

Key points

  • RA 8560 (profession law) governs WHO may practice geodetic engineering — it defines qualifications, licensure, and professional conduct.
  • PD 1529 (Property Registration Decree, 1978) governs HOW land is registered — it is the substantive law on Torrens title system, registration procedures, and land court jurisdiction (Regional Trial Courts as Land Registration Courts).
  • CA 141 (Commonwealth Act 141, Public Land Act, 1936) governs the classification, administration, and disposition of public lands — including homestead, sales, free patent, and cadastral proceedings on public lands.
  • The Geodetic Engineer's role in the land registration system: GEs produce the survey plans and technical descriptions that are the basis for all land titles and certificate of titles under PD 1529.
  • The Land Management Bureau (LMB) under DENR is the technical agency that approves survey plans before submission to the Register of Deeds (RD) and LRA.
  • The LRA (Land Registration Authority) under the DOJ supervises the Register of Deeds network and the Torrens title system.
  • A complete land registration proceeding under PD 1529 requires: (1) A survey plan approved by DENR-LMB, signed by a licensed GE; (2) A technical description verified by LMB; (3) Filing of application in the Regional Trial Court (as LRC); (4) Publication, opposition, hearing; (5) Decree of registration by LRA; (6) Issuance of Original Certificate of Title (OCT) by Register of Deeds.
  • Under CA 141, free patents, homestead patents, and sales patents are processed by DENR through the PENRO/CENRO system; the GE prepares the cadastral survey for the patent application.
  • The Cadastral Act (Act No. 2259) and its provisions under CA 141 authorized the government to conduct cadastral surveys of the entire Philippines — a project still ongoing under DENR.
  • Geodetic engineers must be familiar with DENR Administrative Orders (DAOs) governing survey standards, subdivision regulations, and plan formats.

Definitions

PD 1529 (Property Registration Decree)

Presidential Decree No. 1529 (1978) — the primary law governing the Torrens system of land registration in the Philippines. It governs original registration, subsequent registration, and the powers of the Land Registration Authority.

Importance

Most important land law for GE practice; GE-prepared survey plans are the technical foundation of every land registration proceeding under PD 1529.

CA 141 (Public Land Act)

Commonwealth Act No. 141 (1936) — governs the classification, survey, and disposition of alienable and disposable public lands through homestead, free patent, sales patent, and similar modes.

Importance

GEs prepare cadastral surveys for public land patent applications processed under CA 141 through DENR-PENRO/CENRO.

Land Management Bureau (LMB)

The DENR bureau responsible for survey standards, approval of survey plans, cadastral survey operations, and management of public land records.

Importance

The LMB is the direct technical oversight body for GE survey submissions; its manuals and administrative orders define technical standards.

Torrens System

The system of land registration used in the Philippines (introduced 1902, codified in PD 1529) in which the State guarantees the indefeasibility of registered title. A Certificate of Title (OCT/TCT) is conclusive evidence of ownership.

Importance

Understanding the Torrens system is essential to understanding why accurate GE survey work is legally critical.

Original Certificate of Title (OCT)

The first certificate of title issued to a land owner upon original registration of land under PD 1529. Subsequent transfers produce a Transfer Certificate of Title (TCT).

Importance

Board exams test the difference between OCT (original registration) and TCT (subsequent transfer).

Common mistakes

  • Confusing RA 8560 (who can practice) with PD 1529 (how land is registered) — these are separate statutes with different purposes.
  • Thinking LMB approves the title — LMB approves the survey plan; the LRA/Register of Deeds issues the title.
  • Confusing OCT (original title) and TCT (transfer title): OCT is for first-time registration; TCT results from a subsequent transfer.
  • Not knowing that CA 141 governs public lands while PD 1529 covers both public and private land registration.
  • Failing to link the GE's survey plan to the Torrens registration chain — no approved plan = no title.

Connections

  • RA 8560 (profession law) is inseparable from PD 1529 (land registration) — the GE's signed survey plan is the technical gateway to every Torrens title.
  • The ethics principle of 'integrity of monuments' connects directly to surveying fieldwork: the legal accuracy of cadastral boundaries depends on undisturbed, correctly placed corner monuments.
  • PRS92 (datum) and PPCS/PTM/UTM (projection) connect the legal survey framework to geodetic computations — all exam topics in surveying and geodesy must be contextualized within PRS92.
  • CPD (RA 10912) bridges the ethics chapter (competence) with professional practice requirements, linking legal obligation to moral duty.
  • CA 141 and PD 1529 both require DENR-LMB-approved survey plans — connecting the profession law (RA 8560) to land administration law in a single work product: the GE-certified survey plan.
  • The Torrens system's indefeasibility of title depends on accurate GE surveys — a direct link between professional ethics (accuracy, honesty) and the security of property rights under Philippine law.
  • The disciplinary powers of the PRBGE (RA 8560) and the PRC (RA 8981) connect to the ethics chapter: ethical violations can result in suspension or revocation of the GE's license.
  • The concept of 'reserved acts' under RA 8560 connects to scope-of-practice questions in both the law section and the fieldwork sections of the board examination.

Quick review questions

What law currently governs the practice of geodetic engineering in the Philippines, and what year was it enacted?

Answer

RA 8560, the Philippine Geodetic Engineering Act of 1998.

RA 8560 repealed the original RA 4374 (1965) and is the current, active profession law. It created the PRBGE under the PRC and defines the scope of practice, licensure requirements, and professional standards for geodetic engineers.

Who composes the Professional Regulatory Board of Geodetic Engineering (PRBGE) and who appoints its members?

Answer

The PRBGE has one (1) Chairperson and two (2) Members — three persons total — appointed by the President of the Philippines upon recommendation of the PRC.

A common board-exam trap is to say the PRC appoints the PRBGE members; however, it is the President who makes the appointments. The PRC only recommends. Members must be registered GEs with at least 10 years of professional practice.

An engineering aide who is not a licensed geodetic engineer prepares a complete subdivision survey plan. May they sign and submit it to DENR-LMB for approval?

Answer

No. Only a licensed geodetic engineer may sign and seal survey plans for government submission.

Signing/sealing survey plans is a reserved act under RA 8560. The engineering aide may assist in fieldwork and drafting, but a licensed GE must review, certify, and affix their official PRC seal before the plan has any legal standing.

List the five (5) survey disciplines that fall within the scope of practice of a licensed geodetic engineer.

Answer

  1. Cadastral/Land Surveys; 2. Topographic Surveys; 3. Hydrographic Surveys; 4. Geodetic Surveys; 5. Photogrammetric Surveys.

All five are explicitly covered by RA 8560. Board exams often present a list and ask which ones require a licensed GE — the answer is all of them. The mnemonic C-T-H-G-P helps recall all five types.

What is the official geodetic horizontal datum for all surveys and plans submitted to Philippine government agencies?

Answer

The Philippine Reference System of 1992 (PRS92).

PRS92 replaced the old Luzon Datum of 1911 as the official national horizontal datum. It is compatible with but not identical to WGS84. All current survey submissions to DENR-LMB and LRA must reference PRS92.

A client pressures a licensed GE to move a boundary marker 3 meters into a neighboring titled lot to give the client more area. What is the GE's correct ethical action?

Answer

The GE must refuse the instruction and explain that falsifying boundary positions violates the code of ethics, harms the third party's property rights, and may constitute a criminal act.

Under the GE code of ethics, public interest and accuracy of land records outrank client pressure. Falsifying a boundary harms the neighbor's property rights (a matter of public interest) and violates the honesty principle. The GE may also have a duty to report the attempted fraud to the appropriate authorities.

What is the highest obligation of a geodetic engineer under the professional code of ethics?

Answer

The protection of public interest — ensuring accuracy and integrity of land records to safeguard property rights and public safety.

The ethics hierarchy is: Public Interest > Professional Duty > Client/Employer Interests. This means that even when a client or employer gives contrary instructions, the GE's first duty is to the public.

Distinguish between PD 1529 and CA 141 in relation to geodetic engineering practice.

Answer

PD 1529 (Property Registration Decree, 1978) governs the Torrens system of land registration for both public and private lands. CA 141 (Public Land Act, 1936) governs the classification and disposition of public lands through patents. GEs prepare survey plans for both: for court registration under PD 1529 and for patent applications under CA 141.

RA 8560 defines the profession; PD 1529 and CA 141 define what is done with the survey outputs. Both require a licensed GE's signed and sealed survey plan as a prerequisite for land titling or patent issuance.

Under which law is a homestead patent application processed, and which government bureau approves the survey plan required for such application?

Answer

A homestead patent is processed under CA 141 (Public Land Act) through DENR-PENRO/CENRO. The survey plan is approved by the DENR-Land Management Bureau (LMB).

The LMB is the technical arm of DENR for all survey plan approvals. PENRO (Provincial Environment and Natural Resources Office) and CENRO (Community Environment and Natural Resources Office) handle field-level processing of patent applications under CA 141.

What is the legal basis for requiring CPD compliance for renewal of a geodetic engineer's Professional Identification Card?

Answer

RA 10912, the Continuing Professional Development (CPD) Act of 2016.

RA 10912 made CPD compliance mandatory for the renewal of PICs for all regulated professions, including geodetic engineering. This is also an ethical obligation — the duty of competence requires keeping professional knowledge and skills current.

Diagrams

Geodetic Engineering Law and Ethics — Chapter Overview

A comprehensive mind map showing the entire chapter structure — the profession law (RA 4374/RA 8560), the PRBGE, the scope of practice, the official datum (PRS92), the code of ethics with its hierarchy, and the related land laws (PD 1529, CA 141). Use this as a first-pass orientation tool before studying individual sections.

Land Registration Process — Role of the Geodetic Engineer

A flowchart tracing the complete land registration and patent process — starting from the GE's survey and ending with the issuance of an Original Certificate of Title (OCT). This diagram illustrates the GE's critical role as the gateway to the Torrens system, the parallel pathways for private land (PD 1529) and public land patents (CA 141), and the key government agencies involved (DENR-LMB, LRA, Register of Deeds).

Ethical Decision-Making Framework for Geodetic Engineers

A decision-tree flowchart for ethical situations. It applies the GE code of ethics hierarchy: public interest first, then competence, then conflict-of-interest management. The flowchart covers the three most common board-exam scenarios: instructions to falsify data, tasks beyond competence, and conflicts of interest. Use this as a mental model for answering any scenario-based ethics question on the board exam.

Legislative History of Philippine Geodetic Engineering Law

A chronological timeline of key legislation shaping geodetic engineering practice in the Philippines — from the introduction of the Torrens system (1902) through the CPD Act (2016). This visual helps board examinees see the evolution of the profession's legal framework and contextualize each statute within Philippine legal history.

GE Scope of Practice — Five Survey Disciplines

A pie chart illustrating the five survey disciplines within the legal scope of practice of a licensed geodetic engineer under RA 8560. The relative proportions reflect typical emphasis in board exam questions, with cadastral surveys being the most frequently tested. All five types are within the GE scope and require a licensed GE to sign and certify.

Exam strategy

For the law and ethics section of the GE board exam, use a statute-first approach: identify which law applies (RA 8560 for profession, PD 1529 for registration, CA 141 for public land, RA 10912 for CPD), then apply its specific provisions. For ethics scenario questions, always apply the public-interest test first — if an action harms the public or the integrity of land records, it is unethical, regardless of who instructs it. Memorize the five scope-of-practice survey types (C-T-H-G-P), the PRBGE composition (1 Chair + 2 Members = 3 total, appointed by the President), and the reserved acts of a licensed GE (sign/seal plans, certify cadastral surveys). Do not confuse the profession law (RA 8560) with the land laws (PD 1529, CA 141) — each has a distinct purpose and is tested separately. Allocate at least 30 minutes of your review session to this chapter; it is entirely memorization and application, with no computations, so it should be a reliable source of free marks on exam day.

Geodetic Engineering Law and Code of Ethics is chapter 5 of 5 in the Cadastral Surveys & Land Laws part of Super Tutor's GELE review. The Geodetic Engineer Licensure Examination is given by Professional Regulation Commission (PRC) — Board of Geodetic Engineering; its dates, format and passing rules are on the GELE page. See the GELE guide.